Client Name: UC San Diego
Project Completion: 2021
Project Cost: $523 million
Delivery Method: Stipulated Sum Design-Build
- DPP Review
- Program verification
- Conflicts with Campus requirements
-
Review all Design Build Team Proposals.
- Detailed evaluation of proposal vs. project requirements
- Summary Report on each team.
- Specifications Review including Division One
-
Review all Design Team submittals
- Scope Compliance
- Campus Design Guidelines Alignment
- Cross discipline coordination
- Specification to Drawings
- Issued for Construction submittal review
- All Bulletins
-
CPM Schedule Review
- Baseline Schedule Review
- All Monthly Updates
- Detailed Reports
- Dashboard looks.
- Summary Milestone Reports
- Post Construction Complete Analysis
- Submittal Review
- Review submittals on an as needed basis
- Close-out assistance